Here is the agenda for the SAFD2 Annual Meeting, to be held at the Town Office Conference Room on Monday, June 9, 2014 at 7:00 PM.
Munson is back on the job and laying more pipe. Many customers are working with Phelps Engineering to design the connection to their individual property. As is unfortunately part of construction, some people are experiencing the need for driveway and mailbox repair. Issues are being taken care of as soon as possible after the report is received.
Good news - We plan to connect our first customers to water in June! The project is currently shut down for the winter. Construction will resume when winter weather breaks sufficiently.
This is a photo of one of the Enterprise Trenchless Technologies Inc. crews installing water main by directional bore in the early part of November. The driller can actually steer the drill bit and thus the pipe through the earth, over, under, and around obstacles! This technology was used for all of the road crossings to prevent undo wear and tear on the roads. Munson Earth Moving is installing pipe at a rapid pace. 36% of the water main, or 9025 linear feet have already been installed. The contractor plans to work till just before Christmas, then break for a winter shutdown. Munson began laying pipe today. Very exciting to take the trip down West Shore Rd. and see the crew at work. Munson is getting ready to begin work. On Friday, October 25, they delivered pipe which is sitting at the beginning of the line near the Village, along with a couple of excavators. We should begin seeing lots of activity tomorrow! Looking forward to it! A momentous occasion for SAFD2. Last night we signed the contract with Munson Earth Moving to build Phase One of South Alburgh's Municipal Water System. It has taken over 10 years to reach this point. We are very excited and proud to take this step forward for Alburgh and its residents. Thank you to those of you who supported this effort. We will keep you posted about progress. You can also check out the happenings along West Shore Rd. Digging is set to begin on Monday, October 28, 2013! |
AuthorThe SAFD2 Prudential Committee Archives
October 2014
Categories |